Doha Metro Construction – Phase 3

Client:The United Equipment Group
Flow Rate:40 - 50 m³/hr

Background

The United Equipment Group in Qatar are currently carrying out major construction works to build the Doha Metro leading up to the 2022 World Cup. They are building a city wide underground metro system to provide its citizens with a state of the art transit system. The project is due to be delivered in time to provide a world class service for the influx of football tourists during 2022.

The Overall Objective

As part of the works The United Equipment Group carried out a series of Boring underground using large Tunnel Boring Machines (TBM’s). As a result, water generated from the work is pumped above ground to one of 3 Siltbuster systems across the city.

The water was polluted with slow settling solids made up of calcium carbonate, due to the limestone geology. In addition the water is highly alkaline which requires treatment before discharge.

Solution

Siltbuster provided The United Equipment Group with a number of Hydro-cyclones to remove the coarse solids. Th pH was also reduced by the controlled introduction of Carbon Dioxide.

Results

The Siltbuster system consistently reduces the Total Suspended Solids (TSS) to below 5mg/L whilst neutralising the pH to 7 neutral for safe discharge.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation