Background
The United Equipment Group in Qatar are currently carrying out major construction works to build the Doha Metro leading up to the 2022 World Cup. They are building a city wide underground metro system to provide its citizens with a state of the art transit system. The project is due to be delivered in time to provide a world class service for the influx of football tourists during 2022.
The Overall Objective
As part of the works The United Equipment Group carried out a series of boring underground using large Tunnel Boring Machines (TBM’s). As a result, water generated from the work is pumped above ground to one of 3 Siltbuster systems across the city.
Solution
Siltbuster provided The United Equipment Group with a HB50 unit with chemical dosing to treat the water and remove the solids. The captured slurry was then processed through an automatic filter press.
The Siltbuster system consistently reduces the Total Suspended Solids (TSS) to below 5mg/L whilst reducing the pH to neutral 7.
See Phase 2 of the Doha Metro Construction