Background

TMS Ltd were commissioned by the Environment Agency to make modifications to the existing weir at Countess Weir in Exeter as part of a flood alleviation scheme.

The Overall Objective

The defence scheme will run for some four miles along the river and includes erecting flood-proof glass-panels and demount-able barriers, raising the level of footpaths and building up walls and embankments on both sides of the river. The scheme will reduce the flood risk to over 3,000 homes in the area.

As part of the works a coffer dam was installed leading tot he requirement for a suitable treatment system for high TSS and high pH waters prior to discharge.

Solution

Siltbuster installed a 3 Stage Chemical Dosing System able to treat between 20m³ and 30m³/hr whilst neutralising the high pH water and reducing the suspended solids to be below 40mg/l.

Back to top
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation
A Siltbuster in the sky! The image really shows how space efficient our systems are with a Siltbuster unit hard at… https://t.co/5dYzfYqgVn
12:50 PM 10 Aug 2020 Join the conversation