Forkers Road Bridge Repairs

Client:Forkers

Background

With over 40 years experience and supported by a dedicated team of qualified and experienced staff, Forkers provides a broad range of Civil and Ground Engineering services to both the public and private sectors.

During Road Bridge repair work, Forkers were required to replace existing pipework without affecting the integrity of the bridge.

The Overall Objective

Forkers required a solution able to fit within limited footprint to effectively treat high pH water as a result of Hydrodemolition.

Solution

As a result of the hydrodemolition work carried out, Siltbuster initially installed a HD unit followed by its DS4 FB50 unit to effectively treat the high pH wash water. Once treated, the water was then able to be discharged to a nearby surface watercourse.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation