Background
Roadbridge were carrying out construction work worth 180m Euros to install 3.5 km of gas pipeline and other services from Corrib Gas Pipeline terminal to Landfall Valve.
Roadbridge is a leader in Civil Engineering. Roadbridge has the experience, capability and a proven track record in delivering major projects across a range of sectors.
The Overall Objective
Corrib required water treatment to cope with flows on average up to 100m³/hr.
Solution
Siltbuster installed multiple systems comprising of 6 Dosing Containers, 10 HB50 units, 3 CM400s, 3 Mix Tanks and an ISO Tank. The discharge criteria was below 5mg/l and the installed Siltbuster systems consistently achieved below this number.