Airbus Manufacturing Facility

Client:Morgan Sindall

Background

Airbus’s improvement program appointed Morgan Sindall to undertake the construction of the 52,000m² manufacturing site for the manufacture of wings for the new Airbus A350 and A380.

The Overall Objective

The site had high-level groundwater issues and is within an area regulated by the Environment Agency therefore allowing high pH water to seep into the ground was not an option.

Solution

At first a Siltbuster RCW unit was introduced to site in March 2009. Two more were soon in place to control and treat washwater generated on-site, with a further two made available for use when required during larger concrete pours. During the pouring of the machine bases, truck movements peaked at 283 over the course of just one weekend, necessitating the use of four RCW units at once.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation