Suspended Solids
Find Out More
Slow Settling Solids
Find Out More
Concrete Washwater
Find Out More
Dewatering
Find out More

We are Siltbuster

Queen's Awards for Enterprise- Innovation 2017 Emblem
The UK’s number one solutions provider for on site water treatment, wet waste processing and the prevention of waterborne pollution. We offer an unrivaled range of rapidly deployable solutions for silt management and prevention, control and treatment of water contamination available either for hire or purchase.

As highly experienced process engineers (backed by the largest and most varied hire fleet of water treatment equipment in the UK), our easy-to-use, tailored packages provide solutions which far exceed today’s environmental legislation.

News

A Clean Sweep at Chelsea Barracks
Siltbuster’s sweeper waste dewatering system has enabled Alandale Logistics to halve the number of sweeper vehicles it is using on the £3bn Chelsea Barracks redevelopment
Regulatory Position Statement – “Temporary Dewatering of Excavations to Surface Water”
Earlier today, the Environment Agency published a new Regulatory Position Statement (RPS) entitled “Temporary Dewatering of Excavations to Surface Water.” This potentially has major implications for the disposal of water from construction sites as Dr. Richard Coulton, CEO of Siltbuster explains.
Siltbuster keeps runways safe in London
Siltbuster’s Sweeper Tip systems have been used on the runways at London City and Gatwick airports
Siltbuster and Siltbuster Process Solutions join the Selwood Group
Strategic move creates the leader in complete water handling and treatment solutions
Siltbuster Deployed on UK’s Highways Construction
Currently used on five dual carriageway sites in Aberdeen, Cambridgeshire, Cornwall, Manchester and South Wales, the company’s technology is aiding contractors by decontaminating surface water run-off.
New Licence Requirements for Scottish Construction Sites
Changes to legislation to require contractors to obtain a formal CAR licence prior to commencing works
Siltbuster Launches New Mobile Sweeper Tip
A new system for dewatering sweeper waste on construction sites
Siltbuster Deployed on the Thames Tideway Tunnel Project
Saving precious space on site, reducing man hours and eliminating the need for expensive stabilising agents
Siltbuster Joins the UK’s Largest Concrete Repair Project
Siltbuster working with BMV on M5 Oldbury Viaduct hydrodemolition work
Siltbuster is Shortlisted for the Construction News Specialists Award 2018
Finalist in the Equipment Supplier of the Year category
Siltbuster treats 250,000 cubic metres of water at Wentwood Reservoir
Multistage system which can treat the peak reservoir discharge of up to 600m³/hr. Eight HB50E lamella clarifiers, four MT30 mixing tanks and two chemical dosing containers.
Construction Firms Request Own-Label Versions of Siltbuster Equipment
The RCW is the most common piece of liveried equipment bought by construction firms
Next course Birmingham on 21st March. Book now! https://t.co/vZEsZL9wbu
9:06 AM 21 Feb 2018 Join the conversation
Bookings are now being taken for our 2018 courses on Managing Water Pollution on Construction Sites. These CPD accr… https://t.co/HrRPPhfp8U
12:32 PM 19 Jan 2018 Join the conversation
SPS helps bring in a new era of water treatment at the Mayflower WTW. Two Siltbuster HB300 lamella systems have bee… https://t.co/t1ViaNHVNB
3:45 PM 16 Jan 2018 Join the conversation
Mobile Sweeper Tip for dewatering sweeper waste on construction sites. This system separates solid waste from the w… https://t.co/FY3wkiHR9z
9:10 AM 9 Jan 2018 Join the conversation
New legislation coming into force 1st Jan in Scotland will require contractors to obtain a formal CAR licence from… https://t.co/T7Zs3Ivzi0
11:03 AM 20 Dec 2017 Join the conversation