Wimbleball Dam

Client:South West Water and Wessex Water
Flow Rate:540m³/hr

Background

Wimbleball dam near Dulverton in Somerset is a 50m high concrete diamond headed buttress approximately 300m long and 50m high.

The Overall Objective

Due to leakages, re-grouting works was required to be carried out to repair the dam.

Solution

Siltbuster installed two water treatment plants consisting of a number of HB50’s and MT30 units to deal with the flow of 540m³/hr plus pH monitoring.

Treated: 1.48 million cubic metres of high pH water with slow settling solids in suspension. (10 times the volume of wimble ball dam).

Back to top
Siltbuster are helping Gothenburg construct a new metro while protecting the environment @SmartRailWorldhttps://t.co/BRjm2kr4dz
11:18 AM 25 Jul 2019 Join the conversation
If you're at #EWWMconference in Birmingham today or tomorrow, drop by our Siltbuster Process Solutions stand to dis… https://t.co/MKIdXPh7vp
10:34 AM 16 Jul 2019 Join the conversation
Looking forward to the award night on Thursday! https://t.co/X4gMQNyzOX
7:25 AM 10 Jul 2019 Join the conversation
SPS have a feature in Food Processing Magazine where Rich Matthews discusses how companies are using compact treatm… https://t.co/QveYldVlzV
8:31 AM 2 Jul 2019 Join the conversation
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation