T & M Cable Services Construction Works

Client:T & M Cable Services
Discharge Point:Nearby Brook
Flow Rate:50m³/hr

Background

T & M Cable Services were constructing Excavations were required to lay new cables into a recently constructed switch gear room. Due to the proximity of a nearby brook, groundwater was encountered due to the excavation work being deeper than the base of the brook.

The Overall Objective

The client had a requirement to de-water the excavations and treat waters laden with suspended solids.

Solution

Siltbuster installed its HB50 unit onsite with a 6” pump which enabled flows up to 50m³/hr. As a result of this work, the Environment Agency approved the treated water to be discharged back into the brook based on the Regulatory Position Statement.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation