T & M Cable Services Construction Works

Client:T & M Cable Services
Discharge Point:Nearby Brook
Flow Rate:50m³/hr

Background

T & M Cable Services were constructing Excavations were required to lay new cables into a recently constructed switch gear room. Due to the proximity of a nearby brook, groundwater was encountered due to the excavation work being deeper than the base of the brook.

The Overall Objective

The client had a requirement to de-water the excavations and treat waters laden with suspended solids.

Solution

Siltbuster installed its HB50 unit onsite with a 6” pump which enabled flows up to 50m³/hr. As a result of this work, the Environment Agency approved the treated water to be discharged back into the brook based on the Regulatory Position Statement.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation