Rhigos Mountain wind farm

Client:Jones Brothers & Balfour Beatty JV

Background

On top of Rhigos Mountain (an environment which is battered by heavy wind and rain), Jones Bros were constructing the largest onshore wind farm in England and Wales. A total of 76 turbines were to be installed, creating a 228MW wind farm.

 

The Overall Objective

The large excavations intended for wind turbine bases rapidly filled with clay rich water preventing the pouring of concrete and installation of rebar and leading to the requirement for a suitable solution to treat the silty water.

Solution

Siltbuster supplied a Lamella Clarifier and Chemical Dosing System, capable of accurately introducing the correct amount of chemicals needed to remove the non settling particulates from water. A light weight Pipe Flocculator was chosen as the preferential method of intermixing so that the equipment could be easily moved from one base to the next as they were completed.

Back to top
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation
A Siltbuster in the sky! The image really shows how space efficient our systems are with a Siltbuster unit hard at… https://t.co/5dYzfYqgVn
12:50 PM 10 Aug 2020 Join the conversation