On top of Rhigos Mountain (an environment which is battered by heavy wind and rain), Jones Bros were constructing the largest onshore wind farm in England and Wales. A total of 76 turbines were to be installed, creating a 228MW wind farm.

 

The Overall Objective

The large excavations intended for wind turbine bases rapidly filled with clay rich water preventing the pouring of concrete and installation of rebar and leading to the requirement for a suitable solution to treat the silty water.

Solution

Siltbuster supplied a Lamella Clarifier and Chemical Dosing System, capable of accurately introducing the correct amount of chemicals needed to remove the non settling particulates from water. A light weight Pipe Flocculator was chosen as the preferential method of intermixing so that the equipment could be easily moved from one base to the next as they were completed.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation