Rhigos Mountain wind farm

Client:Jones Brothers & Balfour Beatty JV

Background

On top of Rhigos Mountain (an environment which is battered by heavy wind and rain), Jones Bros were constructing the largest onshore wind farm in England and Wales. A total of 76 turbines were to be installed, creating a 228MW wind farm.

 

The Overall Objective

The large excavations intended for wind turbine bases rapidly filled with clay rich water preventing the pouring of concrete and installation of rebar and leading to the requirement for a suitable solution to treat the silty water.

Solution

Siltbuster supplied a Lamella Clarifier and Chemical Dosing System, capable of accurately introducing the correct amount of chemicals needed to remove the non settling particulates from water. A light weight Pipe Flocculator was chosen as the preferential method of intermixing so that the equipment could be easily moved from one base to the next as they were completed.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation