Client:Forkers
Flow Rate:80m³/hr

Background

Forkers are carrying out construction work to upgrade and install a new pump station in Stafford, West Midlands. The work is being carried out as part of a £5m investment in the area to cope with the increased residential and commercial growth in the area.

The Overall Objective

Due to excavation work carried out before the installation of the new pumping station, groundwater ingress occurred which required treatment before safe discharge to a nearby surface water course.

Solution

Siltbuster provided a 3 stage chemical treatment system which was capable of treating flows of up to 80m³/hr whilst neutralising the high pH water.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation