Pump Station Upgrades

Client:Forkers
Flow Rate:80m³/hr

Background

Forkers are carrying out construction work to upgrade and install a new pump station in Stafford, West Midlands. The work is being carried out as part of a £5m investment in the area to cope with the increased residential and commercial growth in the area.

The Overall Objective

Due to excavation work carried out before the installation of the new pumping station, groundwater ingress occurred which required treatment before safe discharge to a nearby surface water course.

Solution

Siltbuster provided a 3 stage chemical treatment system which was capable of treating flows of up to 80m³/hr whilst neutralising the high pH water.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation