Papworth Hospital Construction

Client:Skanska
Discharge Point:
Flow Rate:

Background

Papworth Hospital is a heart and lung hospital in Cambridgeshire, England. It was home to the first successful heart transplant in the UK and one of the world’s first beating-heart transplants. The hospital is moving to a new premises in time for 2018.

The Overall Objective

During construction ground water ingress and surface water runoff accumulated with exposed geology from the local area. This lead to the water becoming milky due to the presence of limestone, and needed to be removed in order to safely discharged offsite.

Solution

Siltbuster installed an MT8 chemical mixing tank, 1 HB50 Lamella Clarifier and a 2 stage chemical dosing system to successfully treat the water.

Back to top
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation
A Siltbuster in the sky! The image really shows how space efficient our systems are with a Siltbuster unit hard at… https://t.co/5dYzfYqgVn
12:50 PM 10 Aug 2020 Join the conversation