Osborne Construction Bridge Pillar Repairs

Client:Osborne Construction

Background

Osborne Construction is one of the leading construction businesses in the UK. A series of bridges spanning the M5 Motorway required repair works at the foot of their pier’s.

The Overall Objective

Hydrodemolition was chosen as the preferential method to accurately remove the damaged concrete. However, with space being severely restricted and the blast waters needing treatment, a small yet powerful water treatment plant was required.

Solution

Two Siltbuster HD units were deployed along the side of the roadwork’s, each treating 5000 litres of highly alkaline, sediment laden water per hour. The integrated battery removed the need for a generator and minimised the amount of space used on site. By neutralising the waters on site, the need to tanker water away was removed saving hundreds of pounds.

Back to top
Siltbuster are helping Gothenburg construct a new metro while protecting the environment @SmartRailWorldhttps://t.co/BRjm2kr4dz
11:18 AM 25 Jul 2019 Join the conversation
If you're at #EWWMconference in Birmingham today or tomorrow, drop by our Siltbuster Process Solutions stand to dis… https://t.co/MKIdXPh7vp
10:34 AM 16 Jul 2019 Join the conversation
Looking forward to the award night on Thursday! https://t.co/X4gMQNyzOX
7:25 AM 10 Jul 2019 Join the conversation
SPS have a feature in Food Processing Magazine where Rich Matthews discusses how companies are using compact treatm… https://t.co/QveYldVlzV
8:31 AM 2 Jul 2019 Join the conversation
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation