Osborne Construction Bridge Pillar Repairs

Client:Osborne Construction

Background

Osborne Construction is one of the leading construction businesses in the UK. A series of bridges spanning the M5 Motorway required repair works at the foot of their pier’s.

The Overall Objective

Hydrodemolition was chosen as the preferential method to accurately remove the damaged concrete. However, with space being severely restricted and the blast waters needing treatment, a small yet powerful water treatment plant was required.

Solution

Two Siltbuster HD units were deployed along the side of the roadwork’s, each treating 5000 litres of highly alkaline, sediment laden water per hour. The integrated battery removed the need for a generator and minimised the amount of space used on site. By neutralising the waters on site, the need to tanker water away was removed saving hundreds of pounds.

Back to top
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation
Gritbuster on the box! Filming for CBeebies "Do You Know?" took place yesterday at a large road sweeper depot in Te… https://t.co/c3ARSny7tE
8:28 AM 9 Apr 2019 Join the conversation
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation