Network Rail Bridge Improvement

Client:BAM Nuttall

Background

Bam Nuttall were contracted by Network Rail to undertake some improvement works to a Rail Bridge in Pullbrough.

The Overall Objective

As part of the project up to 30 concrete truck delivered to the site per day. To cater for the wash water generated from these trucks, BAM utilised one of their own Siltbuster RCW units to provide a onsite concrete washout solution.

Solution

In addition to their own Siltbuster RCW, BAM also hired an additional Siltbuster pHD unit, which was used in conjunction with the RCW unit but on another part of the site.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation