Malin Floors industrial Concrete Floors

Client:Malin Floors Ltd

Background

Malin Floors Ltd were pouring circa 500m³ of concrete per day which resulted in circa 83 chute wash downs of the concrete truck mixer chutes.

The Overall Objective

The client was discharging to ground with a surface water course following the site boundary at the bottom of the site and required a solution to ensure the water was safe prior to discharge.

Solution

Washdown waters from the concrete truck mixer chutes were fed in to a lined 6 yard skip. Once the cementitious material in the reception skip had settled from suspension, supernatant water was transferred in to a second 6 yard skip for the alkaline waters to be neutralised by the Siltbuster pHD.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation