Lynch Plant Hire Wind Turbine Bases

Client:Lynch Plant Hire

Background

Lynch Plant Hire were providing equipment and services during the construction of a wind turbine bases in Norfolk required large amounts of rebar, and even more concrete.

The Overall Objective

This particular phase of works resulted in concrete mixer trucks constantly pouring throughout the day, all of which needed to be cleaned without the polluting washwater damaging the surrounding environment.

Solution

The answer was the phD, a compact unit which could be delivered to site next day on a single pallet, minimising plant transport costs. The unit was used its traditional setup with 2 skips, and allowed members of staff on site to being treating the concrete washwaters instantly.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation