Background

Lynch Plant Hire were providing equipment and services during the construction of a wind turbine bases in Norfolk required large amounts of rebar, and even more concrete.

The Overall Objective

This particular phase of works resulted in concrete mixer trucks constantly pouring throughout the day, all of which needed to be cleaned without the polluting washwater damaging the surrounding environment.

Solution

The answer was the phD, a compact unit which could be delivered to site next day on a single pallet, minimising plant transport costs. The unit was used its traditional setup with 2 skips, and allowed members of staff on site to being treating the concrete washwaters instantly.

Back to top
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation
Gritbuster on the box! Filming for CBeebies "Do You Know?" took place yesterday at a large road sweeper depot in Te… https://t.co/c3ARSny7tE
8:28 AM 9 Apr 2019 Join the conversation
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation