Background

Lynch Plant Hire were providing equipment and services during the construction of a wind turbine bases in Norfolk required large amounts of rebar, and even more concrete.

The Overall Objective

This particular phase of works resulted in concrete mixer trucks constantly pouring throughout the day, all of which needed to be cleaned without the polluting washwater damaging the surrounding environment.

Solution

The answer was the phD, a compact unit which could be delivered to site next day on a single pallet, minimising plant transport costs. The unit was used its traditional setup with 2 skips, and allowed members of staff on site to being treating the concrete washwaters instantly.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation