London City Centre Dewatering

Client:Skanska PLC

Background

Excavations dug in London city centre began to fill with ground and surface water runoff. With works needing to continue in poor weather conditions, these excavations needed to be dewatered quickly whilst remaining compliant with the sites discharge consent.

The Overall Objective

The restricted site required a compact solution to be able to suitably meet their needs whilst ensuring work could continue without any disruption.

Solution

Siltbuster installed a 2” submersible pump in conjunction with a Siltbuster HB20 to dewater the excavations and enable discharge to the mains sewer.

Additionally Siltbuster HB20 was fitted with an impeller flowmeter to allow the site to record the volume of water discharged (a requirement of their discharge permit).

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation