Background

Jaguar Land Rover tasked Dunton Environmental with the construction of a new storage car park at one of their sites in the UK.

The Overall Objective

During construction there was the requirement to treat 40-80m3/hr of site run off containing a high concentration of slow settling solids.

Solution

Dunton Enviromental used one of Siltbusters containerised chemical dosing system to improve the settlement characteristics of the suspended solids. This was used in conjunction with two Siltbuster HB50 lamella clarifiers to capture and store the solids before the water was discharged to a nearby brook.

A containerised chemical dosing system was used in this application to ensure the security of the chemicals and dosing pumps, whilst enabling the system to be installed at the far end of the site in small footprint.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation