Jaguar Land Rover car park construction

Client:Dunton Environmental
Discharge Point:Nearby Brook
Flow Rate:40-80m³/hr

Background

Jaguar Land Rover tasked Dunton Environmental with the construction of a new storage car park at one of their sites in the UK.

The Overall Objective

During construction there was the requirement to treat 40-80m3/hr of site run off containing a high concentration of slow settling solids.

Solution

Dunton Enviromental used one of Siltbusters containerised chemical dosing system to improve the settlement characteristics of the suspended solids. This was used in conjunction with two Siltbuster HB50 lamella clarifiers to capture and store the solids before the water was discharged to a nearby brook.

A containerised chemical dosing system was used in this application to ensure the security of the chemicals and dosing pumps, whilst enabling the system to be installed at the far end of the site in small footprint.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation