Hotel Construction

Client:ECS Groundworks Ltd
Flow Rate:50m³/hr

Background

In readiness for the construction of a new hotel complex at Heathrow Airport, ECS are conducting ground preparation works and service diversions at a highly constrained and complex site.

The Overall Objective

As part of trenching works being carried out through contaminated ground. All water needed to be collected in a series of networks and treated prior to discharge in order to meet Heathrow Airport’s strict water drainage quality criteria.

Solution

Siltbuster visited the site and planned the works to establish the correct treatment requirements to deal with the flow rates and enable contaminant removal.

Siltbuster installed an HB50 unit to ensure the water could be successfully treated and subsequently discharged from site. Throughout the project Siltbuster provided regular support to ensure any problems could be solved quickly.

Treated water was regularly sampled by Heathrow’s laboratory service and every sample successfully passed its quality criteria.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation