Hotel Construction

Client:ECS Groundworks Ltd
Flow Rate:50m³/hr

Background

In readiness for the construction of a new hotel complex at Heathrow Airport, ECS are conducting ground preparation works and service diversions at a highly constrained and complex site.

The Overall Objective

As part of trenching works being carried out through contaminated ground. All water needed to be collected in a series of networks and treated prior to discharge in order to meet Heathrow Airport’s strict water drainage quality criteria.

Solution

Siltbuster visited the site and planned the works to establish the correct treatment requirements to deal with the flow rates and enable contaminant removal.

Siltbuster installed an HB50 unit to ensure the water could be successfully treated and subsequently discharged from site. Throughout the project Siltbuster provided regular support to ensure any problems could be solved quickly.

Treated water was regularly sampled by Heathrow’s laboratory service and every sample successfully passed its quality criteria.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation