Hinkley Point C Nuclear Power Station

Client:EDF Energy
Discharge Point:
Flow Rate:600m³/hr

Background

Hinkley Point C nuclear power station is a proposal to construct a 3,200 MWe nuclear power station with two EPR reactors in Somerset, England.

The Overall Objective

During works there was the requirement to treat waters with coagulant and flocculant before safe discharge.

Solution

At peak there were 5 Chemical Dosing Systems in use at one time and dealing with flow rates of up to 600m³/hr.

The system monitored the inflow of water and only dosed with chemical when required. In addition to this the out flow was monitored to ensure the treated water remained within the parameters set before safe discharge.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation