Hinkley Point C Nuclear Power Station

Client:EDF Energy
Discharge Point:
Flow Rate:600m³/hr

Background

Hinkley Point C nuclear power station is a proposal to construct a 3,200 MWe nuclear power station with two EPR reactors in Somerset, England.

The Overall Objective

During works there was the requirement to treat waters with coagulant and flocculant before safe discharge.

Solution

At peak there were 5 Chemical Dosing Systems in use at one time and dealing with flow rates of up to 600m³/hr.

The system monitored the inflow of water and only dosed with chemical when required. In addition to this the out flow was monitored to ensure the treated water remained within the parameters set before safe discharge.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation