Henry Construction High Rise Apartments

Client:Henry Construction

Background

Henry Construction were carrying out construction works to build a number of apartments in West London.

The Overall Objective

During the construction work large concrete pours with up to 20 concrete trucks per day distributing the concrete onsite, therefore leading to the requirement for a treatment solution to deal with the concrete wash water.

Solution

Siltbuster installed an RCW unit to fulfill their obligations under the Environment Agency’s Regulatory Position Statement (RPS) ‘Managing concrete wash waters on construction sites’ and ensure the water was suitable for safe discharge.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation