Heathrow Airport Road Construction

Client:Galldris Construction / Balfour Beatty
Discharge Point:Surface Water Drain

Background

Heathrow Airport is the UK’s premier international airport where some 80 airlines fly direct to over 180 destinations worldwide. During improvement works to repair and upgrade a main perimeter road, excavations were dug in the central reservations for work to be carried out.

Due to work being carried out in close proximity to a local canal and also the area having a high water table, the excavations quickly filled with solid laden water.

The Overall Objective

With the ingression of water at multiple locations, numerous pumps were required to continually dewater the working area but further required a treatment system able to deal with the solid laden water.

Solution

Siltbuster initially provided an FB50 settlement unit to address a single section however, off the back of its success 3 more were hired to ensure the waters being discharged to the surface water drain were of a suitable quality.

 

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl