Garston Gasworks

Client:Erith Contractors
Flow Rate:25m³/hr

Background

Garston Gasworks were known for producing carburetted water gas, with coal gas being produced from 1921. The works later had an oil pipeline to the docks.

the works has not been in use since 2008 and was due to be decontaminated and demolished to make space for redevelopment in the area.

The Overall Objective

Erith Contractors were tasked with dewatering 2 gasholder basins to allow for decontamination of the site and subsequent removal of the existing structures in place. The site would then be back filled and used for redevelopment.

Solution

Siltbuster provided Erith with their FB50 plus a CM400 to dewater the site and settle mineral solids before discharging the water safely to the surrounding environment.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation