Garston Gasworks

Client:Erith Contractors
Flow Rate:25m³/hr

Background

Garston Gasworks were known for producing carburetted water gas, with coal gas being produced from 1921. The works later had an oil pipeline to the docks.

the works has not been in use since 2008 and was due to be decontaminated and demolished to make space for redevelopment in the area.

The Overall Objective

Erith Contractors were tasked with dewatering 2 gasholder basins to allow for decontamination of the site and subsequent removal of the existing structures in place. The site would then be back filled and used for redevelopment.

Solution

Siltbuster provided Erith with their FB50 plus a CM400 to dewater the site and settle mineral solids before discharging the water safely to the surrounding environment.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation