CPC Civils Cofferdam Installation

Client:CPC Civils
Discharge Point:Surface Watercourse
Flow Rate:60m³/hr

Background

CPC Civils were carrying out the installation of a sheet piled cofferdam. During construction dirty water infiltrated the work area and required dewatering before it could be safely discharged into the environment.

The Overall Objective

CPC Civils required a treatment system to deal with slow settling solids as a result of the construction work being carried out.

Solution

Siltbuster installed a 2 stage chemical dosing system consisting of 1 MT8 chemical mix tank and 1 HB50 Lamella Clarifier with a flow rate of between 1-60m³/hr, to remove the particulates before finally being discharged further downstream.

Back to top
Merry Christmas from Siltbuster and SPS! Can you spot the squidgy Siltbuster decorations on our tree? https://t.co/ND5al47lAF
1:12 PM 12 Dec 2018 Join the conversation
The product of 2 years worth of research and development between market leaders within their respective fields, the… https://t.co/pCfwxPZi4D
4:38 PM 19 Nov 2018 Join the conversation
The Siltbuster CPD training courses are coming to Chelsea Football Stadium on 21st Nov. Book online now… https://t.co/VaWZjH8KhL
1:40 PM 2 Nov 2018 Join the conversation
Our next Managing Water Pollution on Construction Sites CPD training course is coming to Liverpool on the 31st Oct.… https://t.co/s4tnaRgSVZ
7:59 AM 16 Oct 2018 Join the conversation
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation