Background

Roadbridge were carrying out construction work worth 180m Euros to install 3.5 km of gas pipeline and other services from Corrib Gas Pipeline terminal to Landfall Valve.

Roadbridge is a leader in Civil Engineering. Roadbridge has the experience, capability and a proven track record in delivering major projects across a range of sectors

The Overall Objective

Corrib required water treatment to cope with flows on average up to 100m³/hr.

Solution

Siltbuster installed multiple systems comprising of 6 Dosing Containers, 10 HB50 units, 3 CM400’s. 3 Mix Tanks and an ISO Tank. The discharge criteria was below 5mg/l and the Siltbuster systems installed consistently achieved below this number.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation