Corrib Gas Pipeline Construction

Client:Corrib, Roadbridge
Discharge Point:Surface Watercourse
Flow Rate:100m³/hr

Background

Roadbridge were carrying out construction work worth 180m Euros to install 3.5 km of gas pipeline and other services from Corrib Gas Pipeline terminal to Landfall Valve.

Roadbridge is a leader in Civil Engineering. Roadbridge has the experience, capability and a proven track record in delivering major projects across a range of sectors

The Overall Objective

Corrib required water treatment to cope with flows on average up to 100m³/hr.

Solution

Siltbuster installed multiple systems comprising of 6 Dosing Containers, 10 HB50 units, 3 CM400’s. 3 Mix Tanks and an ISO Tank. The discharge criteria was below 5mg/l and the Siltbuster systems installed consistently achieved below this number.

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation