Cornwall Energy Recovery Centre

Client:Vinci Constrcution
Total Suspended Solids:below 30mg/l
pH Level:6-9

Background

Vinci are building the Cornwall Energy Recovery Centre which will provide electricity for 21,000 homes in the region. The combined heat and power facility will generate 16.6 megawatts of electricity and divert 90% of Cornwall’s residual waste away from landfill.

The Overall Objective

Siltbuster were tasked with dealing with treating surface runoff from site in to the surface water course where Trout are present.

Solution

Previously a Floc Block system was installed onsite but a more efficient and reliable solution was required to ensure the discharge criteria was met.

Siltbuster provided a Two Stage Chemical Treatment System alongside a Siltbuster HB50 at short notice, which enabled Vinci to achieve a TSS of below 30mg/l and pH between 6 – 9 before being safely discharged to the surface water course.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation