Bam Nuttall New Electric Substation

Client:BAM Nuttall
Discharge Point:Surface Watercourse
Flow Rate:50m³/hr

Background

In Blackhillock, Moray, Scotland Bam Nuttall are carrying out the construction of a new £120m electricity substation scheduled for completion in 2019. This will be a major reinforcement of the transmission network serving the north of Scotland, enabling proposed wind, wave and tidal generation sites to connect.

The Overall Objective

As work was carried out, topsoil’s were stripped and left exposed to rainfall and surface water runoff. Excavations quickly began to fill with water and clay from the surrounding landscape and required chemical treatment before being released off site.

Solution

Two Siltbuster chemical dosing units were deployed and commissioned at short notice allowing site to continue with the work with little disruption.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation