BAM Nuttall M1 Widening Scheme

Client:BAM Nuttall

Background

BAM Nuttall were carrying out work as part of the M1 widening scheme. During works our client was granted a permit to discharge 2 m³/day of treated concrete washwater into a motorway drainage channel which linked into a surface watercourse.

The Overall Objective

Washdown waters from the onsite batching plant and the 7 no. lorries that were feeding the slipform paving machines on the motorway, were held in a catchpit.

Solution

At the end of each day 2 m³ of water was transferred into the water holding tank and treated using the pHD unit ready for discharge to the surface watercourse in the morning.

Back to top
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation
A Siltbuster in the sky! The image really shows how space efficient our systems are with a Siltbuster unit hard at… https://t.co/5dYzfYqgVn
12:50 PM 10 Aug 2020 Join the conversation