American Embassy Construction

Client:O'keefe Contractors

Background

During the construction of civil works at the American Embassy site in London by O’keefe Contractors, solid laden water along with free phase hydrocarbon were encountered onsite.

Ground was broken on November 13, 2013, and the building is expected to be complete by 2017.

 

The Overall Objective

Siltbuster were tasked with dealing with two problems, the first was to remove suspended solids from the water onsite and secondly to remove the hydrocarbon to allow for safe discharge offsite.

 

Solution

Siltbuster installed its HB50-OWS (Oil Water Separator), to effectively treat the suspended solids and remove the free phase hydrocarbon by skimming it off and safely capturing it before removal from site.

 

Back to top
A multitasking green #Siltbuster! A bespoke iHB20R is going through final assembly and testing in our workshop befo… https://t.co/hEApXLG7to
12:08 PM 28 Oct 2020 Join the conversation
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation