Background

Alun Griffiths were completing construction of a new road in the Cross Hands area of West Wales. With 11 hectares of land exposed during one of the wettest periods of 2014, a large purpose built attenuation pond quickly filled with surface water runoff.

The Overall Objective

As the weather continued to deteriorate, more solid laden water run off seeped into the lagoon. To avoid causing pollution, Siltbuster were tasked with treating the water.

Solution

Siltbuster installed a 2 stage flow proportional chemical treatment system at short notice, capable of achieving a flow rate of up to 100m³/hr. The digital dosing equipment used, eliminated any pollution risks and the water standards achieved were among the highest standards.

Back to top
Cost-efficiency, cost savings and discharge compliance! A Siltbuster solution consisting of a Chemical Mix Tank and… https://t.co/nUDuBNcVfU
2:52 PM 15 Oct 2020 Join the conversation
Autumn greetings from Paris where Siltbuster systems are hard at work at numerous locations throughout the gigantic… https://t.co/bMbHGDKuuD
2:49 PM 15 Oct 2020 Join the conversation
"An overview of surface water management in the construction sector and an introduction to Siltbuster Ltd". Regist… https://t.co/5ZHcbwJQkU
8:45 AM 9 Oct 2020 Join the conversation
#Siltbuster HQ is very busy, including loading and dispatch of 3 full lorries heading for the North East with final… https://t.co/uLmtExWzEl
8:14 AM 9 Sep 2020 Join the conversation
A Siltbuster in the sky! The image really shows how space efficient our systems are with a Siltbuster unit hard at… https://t.co/5dYzfYqgVn
12:50 PM 10 Aug 2020 Join the conversation