Alun Griffiths Road Construction

Client:Alun Griffiths
Flow Rate:100m³/hr

Background

Alun Griffiths were completing construction of a new road in the Cross Hands area of West Wales. With 11 hectares of land exposed during one of the wettest periods of 2014, a large purpose built attenuation pond quickly filled with surface water runoff.

The Overall Objective

As the weather continued to deteriorate, more solid laden water run off seeped into the lagoon. To avoid causing pollution, Siltbuster were tasked with treating the water.

Solution

Siltbuster installed a 2 stage flow proportional chemical treatment system at short notice, capable of achieving a flow rate of up to 100m³/hr. The digital dosing equipment used, eliminated any pollution risks and the water standards achieved were among the highest standards.

Back to top
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation
Visit Siltbuster at the Plantworx show, 11th – 13th June at East of England Arena Peterborough. Our large outdoor s… https://t.co/VHxIOSJFCM
9:25 AM 5 Jun 2019 Join the conversation
SPS have commissioned a new effluent treatment plant for Tata Steel. Read about the project in Machinery Market:… https://t.co/Dz4YsVrqnm
9:12 AM 22 May 2019 Join the conversation
Siltbuster is presenting at the next Geotex seminar in Duxford, Cambridgeshire on the 15th May. Register for your f… https://t.co/lPIbvmmMmo
9:33 AM 7 May 2019 Join the conversation
The next Siltbuster CPD training course is coming to Edinburgh Zoo this month on the 22nd May. Book your place onli… https://t.co/zMUGwLfsN9
12:41 PM 1 May 2019 Join the conversation