Sirius Group Construction

Background Sirius Group were carrying out remediation work on a site in Bolton. The site had a history of contamination and as a result of excavation work carried out and a series of storms. The Overall Objective The surface water runoff became contaminated with free phase and dissolved hydrocarbons. Sirius required a suitable system that … Continued

LK Group Construction Site

Background The LK Group were carrying out construction works at a site in Bury, England. The Overall Objective LK had an issue on site where they required the removal of suspended solids which was polluting the water during a remediation project. Additionally free phase hydrocarbon was floating on the surface of the water from historical … Continued

BKP Waste Recycling Ltd

Background BKP Waste Recycling Ltd are a leading provider of environmental solutions. They provide waste management and removal services and are experts in hazardous and liquid waste. They are able to offer businesses a total waste management solution for waste collection, handling and disposal. The Overall Objective BKP receive oily/water mixtures from across the country before … Continued

Jaguar Landrover Manufacturing Plant

Background Jaguar Landrover were building a new engine manufacturing plant at Wolverhampton. Vinci were asked to conduct widespread lime stabilisation of contaminated clay ground ahead of the main build. The Overall Objective A large flat area of clay with no drain runs was lime stabilised to prepare for the building. Heavy rains and multiple plant … Continued

Queensbury Tunnel Repairs

Background The Queensbury Tunnel stands as a monument to the determination and courage exhibited by railway engineers during the Victorian era. The historic former railway tunnel is now closed, derelict and flooded. It also has the dubious title of the ‘UKs most dangerous tunnel’. Hammond ECS are tunnelling specialists who were tasked to assess the … Continued

Countess Weir Flood Defence Scheme

Background TMS Ltd were commissioned by the Environment Agency to make modifications to the existing weir at Countess Weir in Exeter as part of a flood alleviation scheme. The Overall Objective The defence scheme will run for some four miles along the river and includes erecting flood-proof glass-panels and demount-able barriers, raising the level of … Continued

Bison Manufacturing

Background Bison Manufacturing produce precast concrete products such as flooring and structural framing components. They have supplied and continue to supply many of the most prestigious projects in the UK introducing a number of construction solutions. The Overall Objective At their factory in Swadlincote they required high pH 13 solid laden water as a result … Continued

Malin Floors industrial Concrete Floors

Background Malin Floors Ltd were pouring circa 500m³ of concrete per day which resulted in circa 83 chute wash downs of the concrete truck mixer chutes. The Overall Objective The client was discharging to ground with a surface water course following the site boundary at the bottom of the site and required a solution to … Continued

Easycrete Concrete Supplier

Background Easycrete Ltd is a family-owned and independent ready-mix concrete supplier. They moved to a new facility in 2015 and as a result have increased the volume of ready-mix concrete batches up to 300m³ daily. Each day their fleet are required to be washed out. The Overall Objective Easycrete required a suitable solution to separate … Continued

T & M Cable Services Construction Works

Background T & M Cable Services were constructing Excavations were required to lay new cables into a recently constructed switch gear room. Due to the proximity of a nearby brook, groundwater was encountered due to the excavation work being deeper than the base of the brook. The Overall Objective The client had a requirement to … Continued

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation