Frontier Park, Blackburn

Background Barnfield Construction are construction partners on a 93 acre complex multi-use development involving large scale earthworks and site re-profiling at junction six of the M65. The multi-million pound industrial and leisure development is expected to create nearly 2,000 jobs. Frontier Park will comprise around 1 million sq ft of new warehouse and industrial building, … Continued

Wentwood Reservoir

Background Wentwood Reservoir in South Wales has a Victorian control tower with 18th century valves which needed to be removed and replaced, bringing it up to current working standards. To gain access to the base of the tower, 250,000 m3 of water needed to be drained from the 42 acre reservoir.   The Overall Objective … Continued

Trago Mills Construction

Background Kier is managing the construction of a new Trago Mills superstore in Merthyr Tydfil, South Wales. The periods of heavy rain experienced in the local area since the construction began last year have been resulting in large amounts of water runoff mixing with exposed soil particles from the stripped surface at the site. This silty … Continued

Wimbleball Dam

Background Wimbleball dam near Dulverton in Somerset is a 50m high concrete diamond headed buttress approximately 300m long and 50m high. The Overall Objective Due to leakages, re-grouting works was required to be carried out to repair the dam. Solution Siltbuster installed two water treatment plants consisting of a number of HB50’s and MT30 units … Continued

Hinkley Point C Nuclear Power Station

Background Hinkley Point C nuclear power station is a proposal to construct a 3,200 MWe nuclear power station with two EPR reactors in Somerset, England. The Overall Objective During works there was the requirement to treat waters with coagulant and flocculant before safe discharge. Solution At peak there were 5 Chemical Dosing Systems in use … Continued

Copenhagen Metro Line

Background In Copenhagen’s city centre, work on the expansion of the Copenhagen Metro Line is underway, spanning 15km in length with 17 upgraded stations when complete which will improve commuting times. The Overall Objective The natural high water table and predominantly limestone geology, has caused a number of issues during construction. Siltbuster were tasked with treating … Continued

Hotel Construction

Background In readiness for the construction of a new hotel complex at Heathrow Airport, ECS are conducting ground preparation works and service diversions at a highly constrained and complex site. The Overall Objective As part of trenching works being carried out through contaminated ground. All water needed to be collected in a series of networks … Continued

Doha Metro Construction – Phase 3

Background The United Equipment Group in Qatar are currently carrying out major construction works to build the Doha Metro leading up to the 2022 World Cup. They are building a city wide underground metro system to provide its citizens with a state of the art transit system. The project is due to be delivered in … Continued

Doha Metro Construction – Phase 2

Background The United Equipment Group in Qatar are currently carrying out major construction works to build the Doha Metro leading up to the 2022 World Cup. They are building a city wide underground metro system to provide its citizens with a state of the art transit system. The project is due to be delivered in … Continued

Doha Metro Construction – Phase 1

Background The United Equipment Group in Qatar are currently carrying out major construction works to build the Doha Metro leading up to the 2022 World Cup. They are building a city wide underground metro system to provide its citizens with a state of the art transit system. The project is due to be delivered in … Continued

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation