Wentwood Reservoir

Background Wentwood Reservoir in South Wales has a Victorian control tower with 18th century valves which needed to be removed and replaced, bringing it up to current working standards. To gain access to the base of the tower, 250,000 m3 of water needed to be drained from the 42 acre reservoir.   The Overall Objective … Continued

Aberdeen Western Peripheral Route

Background The new Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T) project is being constructed on behalf of Transport Scotland and its partners Aberdeen City Council and Aberdeenshire Council. It is one of the longest road construction projects currently underway in the UK, comprising 58km of dual carriageway.   The Overall Objective Following periods of heavy rain, water … Continued

Trago Mills Construction

Background Kier is managing the construction of a new Trago Mills superstore in Merthyr Tydfil, South Wales. The periods of heavy rain experienced in the local area since the construction began last year have been resulting in large amounts of water runoff mixing with exposed soil particles from the stripped surface at the site. This silty … Continued

Aldi Rhuddlan Construction

Background During construction of a new Aldi superstore near the river Clwyd in Rhuddlan, North Wales, a water treatment system was required to clean dirty surface water runoff before discharge to the surface water course.   The Overall Objective To consistently achieve a discharge criteria of TSS of <60mg/l and pH of between 6 and … Continued

Westnewton Bridge

Background Westnewton Bridge is a grade II listed building in Kirknewton, Northumberland, England. This Grade II English Heritage protected site was in use by cars and heavy goods vehicles, but Northumberland County Council were going to have to close it if action wasn’t taken. The Overall Objective Due to repair work being required to the … Continued

Wimbleball Dam

Background Wimbleball dam near Dulverton in Somerset is a 50m high concrete diamond headed buttress approximately 300m long and 50m high. The Overall Objective Due to leakages, re-grouting works was required to be carried out to repair the dam. Solution Siltbuster installed two water treatment plants consisting of a number of HB50’s and MT30 units … Continued

Hinkley Point C Nuclear Power Station

Background Hinkley Point C nuclear power station is a proposal to construct a 3,200 MWe nuclear power station with two EPR reactors in Somerset, England. The Overall Objective During works there was the requirement to treat waters with coagulant and flocculant before safe discharge. Solution At peak there were 5 Chemical Dosing Systems in use … Continued

Copenhagen Metro Line

Background In Copenhagen’s city centre, work on the expansion of the Copenhagen Metro Line is underway, spanning 15km in length with 17 upgraded stations when complete which will improve commuting times. The Overall Objective The natural high water table and predominantly limestone geology, has caused a number of issues during construction. Siltbuster were tasked with treating … Continued

LK Group Construction Site

Background The LK Group were carrying out construction works at a site in Bury, England. The Overall Objective LK had an issue on site where they required the removal of suspended solids which was polluting the water during a remediation project. Additionally free phase hydrocarbon was floating on the surface of the water from historical … Continued

Slade Heath Pumping Station Construction

Background During construction works to build new pipes and a pumping station to connect over 70 homes in Slade Heath, Forkers required a suitable solution to treat slow settling clay particles in water.   The Overall Objective To ensure the slow settling material could settle from suspension, chemical treatment was required before safe discharge to … Continued

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation