Sirius Group Construction
Background Sirius Group were carrying out remediation work on a site in Bolton. The site had a history of contamination and as a result of excavation work carried out and a series of storms. The Overall Objective The surface water runoff became contaminated with free phase and dissolved hydrocarbons. Sirius required a suitable system that … Continued