Sirius Group Construction

Background Sirius Group were carrying out remediation work on a site in Bolton. The site had a history of contamination and as a result of excavation work carried out and a series of storms. The Overall Objective The surface water runoff became contaminated with free phase and dissolved hydrocarbons. Sirius required a suitable system that … Continued

LK Group Construction Site

Background The LK Group were carrying out construction works at a site in Bury, England. The Overall Objective LK had an issue on site where they required the removal of suspended solids which was polluting the water during a remediation project. Additionally free phase hydrocarbon was floating on the surface of the water from historical … Continued

BKP Waste Recycling Ltd

Background BKP Waste Recycling Ltd are a leading provider of environmental solutions. They provide waste management and removal services and are experts in hazardous and liquid waste. They are able to offer businesses a total waste management solution for waste collection, handling and disposal. The Overall Objective BKP receive oily/water mixtures from across the country before … Continued

Garston Gasworks

Background Garston Gasworks were known for producing carburetted water gas, with coal gas being produced from 1921. The works later had an oil pipeline to the docks. the works has not been in use since 2008 and was due to be decontaminated and demolished to make space for redevelopment in the area. The Overall Objective … Continued

American Embassy Construction

Background During the construction of civil works at the American Embassy site in London by O’keefe Contractors, solid laden water along with free phase hydrocarbon were encountered onsite. Ground was broken on November 13, 2013, and the building is expected to be complete by 2017.   The Overall Objective Siltbuster were tasked with dealing with … Continued

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation