Ynysangharad Park Redevelopment

Client:Kier Construction
Month / Year:Jan-current 2016

Background

Kier Construction are carrying out a £6.2m scheme to redevelop the open air swimming pool at Ynysangharad Park in Pontypool. The pool was originally built in 1927 and is the only listed lido to survive in Wales. The work for Rhondda Cynon Taf council aims to attract over 30,000 people to use the pool annually.

The Overall Objective

The project was carried out during the summer months. Due to large, open and deep excavations, areas onsite quickly filled with sediment rich ground water and required safe removal from site for the work to continue.

Solution

Siltbuster deployed its HB50 settlement unit with an added Flocc Block as the water was clay laden and required chemical treatment. With the addition of the dissolvable Flocc block, even the clay sized solids were successfully removed from suspension, allowing the water to be safely discharged offsite.

Back to top
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation
Our open day is underway! https://t.co/khoNExHdSh
2:32 PM 5 Oct 2018 Join the conversation
Get an overview of what Siltbuster does! Join us tomorrow between 2pm and 4.30pm for our Open Afternoon. Get a tour… https://t.co/bzqbT7rKCE
1:22 PM 4 Oct 2018 Join the conversation
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation