Wimbleball Dam

Client:South West Water and Wessex Water
Flow Rate:540m³/hr

Background

Wimbleball dam near Dulverton in Somerset is a 50m high concrete diamond headed buttress approximately 300m long and 50m high.

The Overall Objective

Due to leakages, re-grouting works was required to be carried out to repair the dam.

Solution

Siltbuster installed two water treatment plants consisting of a number of HB50’s and MT30 units to deal with the flow of 540m³/hr plus pH monitoring.

Treated: 1.48 million cubic metres of high pH water with slow settling solids in suspension. (10 times the volume of wimble ball dam).

Back to top
Merry Christmas from Siltbuster and SPS! Can you spot the squidgy Siltbuster decorations on our tree? https://t.co/ND5al47lAF
1:12 PM 12 Dec 2018 Join the conversation
The product of 2 years worth of research and development between market leaders within their respective fields, the… https://t.co/pCfwxPZi4D
4:38 PM 19 Nov 2018 Join the conversation
The Siltbuster CPD training courses are coming to Chelsea Football Stadium on 21st Nov. Book online now… https://t.co/VaWZjH8KhL
1:40 PM 2 Nov 2018 Join the conversation
Our next Managing Water Pollution on Construction Sites CPD training course is coming to Liverpool on the 31st Oct.… https://t.co/s4tnaRgSVZ
7:59 AM 16 Oct 2018 Join the conversation
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation