Wimbleball Dam

Client:South West Water and Wessex Water
Flow Rate:540m³/hr

Background

Wimbleball dam near Dulverton in Somerset is a 50m high concrete diamond headed buttress approximately 300m long and 50m high.

The Overall Objective

Due to leakages, re-grouting works was required to be carried out to repair the dam.

Solution

Siltbuster installed two water treatment plants consisting of a number of HB50’s and MT30 units to deal with the flow of 540m³/hr plus pH monitoring.

Treated: 1.48 million cubic metres of high pH water with slow settling solids in suspension. (10 times the volume of wimble ball dam).

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation