T & M Cable Services Construction Works

Client:T & M Cable Services
Discharge Point:Nearby Brook
Flow Rate:50m³/hr

Background

T & M Cable Services were constructing Excavations were required to lay new cables into a recently constructed switch gear room. Due to the proximity of a nearby brook, groundwater was encountered due to the excavation work being deeper than the base of the brook.

The Overall Objective

The client had a requirement to de-water the excavations and treat waters laden with suspended solids.

Solution

Siltbuster installed its HB50 unit onsite with a 6” pump which enabled flows up to 50m³/hr. As a result of this work, the Environment Agency approved the treated water to be discharged back into the brook based on the Regulatory Position Statement.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation