Student Accommodation, Cardiff

Client:Vinci Construction

Background

In central Cardiff, Vinci Construction were constructing two new student accommodation blocks.

The Overall Objective

During construction up to 30 concrete lorries required wash downs on a daily basis, leading to high pH wash water needing to be treated before safe discharge offsite.

Solution

Siltbuster installed its RCW unit as the most effective solution to deal with the resulting wash water and neutralise the highly alkaline water within a limited space on site. The RCW was able to consistently treat the high pH water of 12-13 to be between the discharge criteria of 6-9. Siltbuster also provided on site training to enable site operators to effectively work the system.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation