Sirius Group Construction

Client:Sirius Group
Flow Rate:6m³/hr

Background

Sirius Group were carrying out remediation work on a site in Bolton. The site had a history of contamination and as a result of excavation work carried out and a series of storms.

The Overall Objective

The surface water runoff became contaminated with free phase and dissolved hydrocarbons. Sirius required a suitable system that could ensure the water could be treated whilst settling the solids and removing the floating oils.

Solution

Siltbuster were able to deploy a multi stage treatment system at short notice which could instantaneously treat 6m³ of polluted water. The water was pumped into a Siltbuster HB50-OWS where the solids were removed from suspension and capture the floating oils.

The treatment system prevented polluted water from escaping the site reduced the frequency of backwashing their carbon vessel, removing the need to dispose of at high costs.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation