Renaker Build Apartment Block Construction

Client:Renaker Build

Background

Renaker Build were tasked with the construction of a new apartment block in central Manchester. During the construction large volumes of concrete were being poured as part of the works.

The Overall Objective

With trucks moving back and forth across site, copious amounts of wash was being used for the cleaning of the wagon’s chutes which needed to be treated prior to disposal to the foul sewage network.

Solution

A Siltbuster RCW was used, powered from its own internal battery, to handle 20 truck wash downs. It automatically neutralised the alkaline pH level and removed the associate aggregate from suspension.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation