Renaker Build Apartment Block Construction

Client:Renaker Build

Background

Renaker Build were tasked with the construction of a new apartment block in central Manchester. During the construction large volumes of concrete were being poured as part of the works.

The Overall Objective

With trucks moving back and forth across site, copious amounts of wash was being used for the cleaning of the wagon’s chutes which needed to be treated prior to disposal to the foul sewage network.

Solution

A Siltbuster RCW was used, powered from its own internal battery, to handle 20 truck wash downs. It automatically neutralised the alkaline pH level and removed the associate aggregate from suspension.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation