Pump Station Upgrades

Client:Forkers
Flow Rate:80m³/hr

Background

Forkers are carrying out construction work to upgrade and install a new pump station in Stafford, West Midlands. The work is being carried out as part of a £5m investment in the area to cope with the increased residential and commercial growth in the area.

The Overall Objective

Due to excavation work carried out before the installation of the new pumping station, groundwater ingress occurred which required treatment before safe discharge to a nearby surface water course.

Solution

Siltbuster provided a 3 stage chemical treatment system which was capable of treating flows of up to 80m³/hr whilst neutralising the high pH water.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation