Pump Station Upgrades

Client:Forkers
Flow Rate:80m³/hr

Background

Forkers are carrying out construction work to upgrade and install a new pump station in Stafford, West Midlands. The work is being carried out as part of a £5m investment in the area to cope with the increased residential and commercial growth in the area.

The Overall Objective

Due to excavation work carried out before the installation of the new pumping station, groundwater ingress occurred which required treatment before safe discharge to a nearby surface water course.

Solution

Siltbuster provided a 3 stage chemical treatment system which was capable of treating flows of up to 80m³/hr whilst neutralising the high pH water.

Back to top
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation