Papworth Hospital is a heart and lung hospital in Cambridgeshire, England. It was home to the first successful heart transplant in the UK and one of the world’s first beating-heart transplants. The hospital is moving to a new premises in time for 2018.

The Overall Objective

During construction ground water ingress and surface water runoff accumulated with exposed geology from the local area. This lead to the water becoming milky due to the presence of limestone, and needed to be removed in order to safely discharged offsite.

Solution

Siltbuster installed an MT8 chemical mixing tank, 1 HB50 Lamella Clarifier and a 2 stage chemical dosing system to successfully treat the water.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation