Osborne Construction is one of the leading construction businesses in the UK. A series of bridges spanning the M5 Motorway required repair works at the foot of their pier’s.

The Overall Objective

Hydrodemolition was chosen as the preferential method to accurately remove the damaged concrete. However, with space being severely restricted and the blast waters needing treatment, a small yet powerful water treatment plant was required.

Solution

Two Siltbuster HD units were deployed along the side of the roadwork’s, each treating 5000 litres of highly alkaline, sediment laden water per hour. The integrated battery removed the need for a generator and minimised the amount of space used on site. By neutralising the waters on site, the need to tanker water away was removed saving hundreds of pounds.

Back to top
Merry Christmas from Siltbuster and SPS! Can you spot the squidgy Siltbuster decorations on our tree? https://t.co/ND5al47lAF
1:12 PM 12 Dec 2018 Join the conversation
The product of 2 years worth of research and development between market leaders within their respective fields, the… https://t.co/pCfwxPZi4D
4:38 PM 19 Nov 2018 Join the conversation
The Siltbuster CPD training courses are coming to Chelsea Football Stadium on 21st Nov. Book online now… https://t.co/VaWZjH8KhL
1:40 PM 2 Nov 2018 Join the conversation
Our next Managing Water Pollution on Construction Sites CPD training course is coming to Liverpool on the 31st Oct.… https://t.co/s4tnaRgSVZ
7:59 AM 16 Oct 2018 Join the conversation
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation