Client:BAM Nuttall

Background

Bam Nuttall were contracted by Network Rail to undertake some improvement works to a Rail Bridge in Pullbrough.

The Overall Objective

As part of the project up to 30 concrete truck delivered to the site per day. To cater for the wash water generated from these trucks, BAM utilised one of their own Siltbuster RCW units to provide a onsite concrete washout solution.

Solution

In addition to their own Siltbuster RCW, BAM also hired an additional Siltbuster pHD unit, which was used in conjunction with the RCW unit but on another part of the site.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation