Network Rail Bridge Improvement

Client:BAM Nuttall

Background

Bam Nuttall were contracted by Network Rail to undertake some improvement works to a Rail Bridge in Pullbrough.

The Overall Objective

As part of the project up to 30 concrete truck delivered to the site per day. To cater for the wash water generated from these trucks, BAM utilised one of their own Siltbuster RCW units to provide a onsite concrete washout solution.

Solution

In addition to their own Siltbuster RCW, BAM also hired an additional Siltbuster pHD unit, which was used in conjunction with the RCW unit but on another part of the site.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation