Malin Floors industrial Concrete Floors

Client:Malin Floors Ltd

Background

Malin Floors Ltd were pouring circa 500m³ of concrete per day which resulted in circa 83 chute wash downs of the concrete truck mixer chutes.

The Overall Objective

The client was discharging to ground with a surface water course following the site boundary at the bottom of the site and required a solution to ensure the water was safe prior to discharge.

Solution

Washdown waters from the concrete truck mixer chutes were fed in to a lined 6 yard skip. Once the cementitious material in the reception skip had settled from suspension, supernatant water was transferred in to a second 6 yard skip for the alkaline waters to be neutralised by the Siltbuster pHD.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation