Malin Floors industrial Concrete Floors

Client:Malin Floors Ltd

Background

Malin Floors Ltd were pouring circa 500m³ of concrete per day which resulted in circa 83 chute wash downs of the concrete truck mixer chutes.

The Overall Objective

The client was discharging to ground with a surface water course following the site boundary at the bottom of the site and required a solution to ensure the water was safe prior to discharge.

Solution

Washdown waters from the concrete truck mixer chutes were fed in to a lined 6 yard skip. Once the cementitious material in the reception skip had settled from suspension, supernatant water was transferred in to a second 6 yard skip for the alkaline waters to be neutralised by the Siltbuster pHD.

Back to top
Our next Managing Water Pollution on Construction Sites CPD training course is coming to Liverpool on the 31st Oct.… https://t.co/s4tnaRgSVZ
7:59 AM 16 Oct 2018 Join the conversation
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation
Our open day is underway! https://t.co/khoNExHdSh
2:32 PM 5 Oct 2018 Join the conversation
Get an overview of what Siltbuster does! Join us tomorrow between 2pm and 4.30pm for our Open Afternoon. Get a tour… https://t.co/bzqbT7rKCE
1:22 PM 4 Oct 2018 Join the conversation
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation