Lynch Plant Hire Wind Turbine Bases

Client:Lynch Plant Hire

Background

Lynch Plant Hire were providing equipment and services during the construction of a wind turbine bases in Norfolk required large amounts of rebar, and even more concrete.

The Overall Objective

This particular phase of works resulted in concrete mixer trucks constantly pouring throughout the day, all of which needed to be cleaned without the polluting washwater damaging the surrounding environment.

Solution

The answer was the phD, a compact unit which could be delivered to site next day on a single pallet, minimising plant transport costs. The unit was used its traditional setup with 2 skips, and allowed members of staff on site to being treating the concrete washwaters instantly.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation