London City Centre Dewatering

Client:Skanska PLC

Background

Excavations dug in London city centre began to fill with ground and surface water runoff. With works needing to continue in poor weather conditions, these excavations needed to be dewatered quickly whilst remaining compliant with the sites discharge consent.

The Overall Objective

The restricted site required a compact solution to be able to suitably meet their needs whilst ensuring work could continue without any disruption.

Solution

Siltbuster installed a 2” submersible pump in conjunction with a Siltbuster HB20 to dewater the excavations and enable discharge to the mains sewer.

Additionally Siltbuster HB20 was fitted with an impeller flowmeter to allow the site to record the volume of water discharged (a requirement of their discharge permit).

Back to top
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation
Our open day is underway! https://t.co/khoNExHdSh
2:32 PM 5 Oct 2018 Join the conversation
Get an overview of what Siltbuster does! Join us tomorrow between 2pm and 4.30pm for our Open Afternoon. Get a tour… https://t.co/bzqbT7rKCE
1:22 PM 4 Oct 2018 Join the conversation
SPS will be at the Ricoh arena next week, exhibiting at this year's @FDBexpo (stand s02). Register for FREE now at… https://t.co/Z5M6bpWr99
3:30 PM 25 Sep 2018 Join the conversation
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation