London City Centre Dewatering

Client:Skanska PLC

Background

Excavations dug in London city centre began to fill with ground and surface water runoff. With works needing to continue in poor weather conditions, these excavations needed to be dewatered quickly whilst remaining compliant with the sites discharge consent.

The Overall Objective

The restricted site required a compact solution to be able to suitably meet their needs whilst ensuring work could continue without any disruption.

Solution

Siltbuster installed a 2” submersible pump in conjunction with a Siltbuster HB20 to dewater the excavations and enable discharge to the mains sewer.

Additionally Siltbuster HB20 was fitted with an impeller flowmeter to allow the site to record the volume of water discharged (a requirement of their discharge permit).

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation