Kier Construction A30 Improvement Scheme

Client:Kier Construction
Discharge Point:Surface Watercourse
Flow Rate:20m³/hr

Background

Kier Construction are carrying out Improvement works to widen the carriageway are being carried out on the A30 between Temple and Higher Carblake to deal with major congestion in the area.

The Overall Objective

As part of the works a number of on-site lagoons were created to deal with surface water run off. The on-site water contains slow settling solids and the discharge consent for the area is to ensure the Total Suspended Solids (TSS) content is less than 30mg/l and the pH is between 6 and 9.

Solution

Siltbuster installed a 3 stage chemical treatment system consisting of a Mix Tank and a HB50 to treat 20m³/hr plus a monitoring system to ensure the TSS and pH levels were correct before discharge.

The system was able to reduce the TSS from 144mg/l.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation