Jaguar Land Rover car park construction

Client:Dunton Environmental
Discharge Point:Nearby Brook
Flow Rate:40-80m³/hr

Background

Jaguar Land Rover tasked Dunton Environmental with the construction of a new storage car park at one of their sites in the UK.

The Overall Objective

During construction there was the requirement to treat 40-80m3/hr of site run off containing a high concentration of slow settling solids.

Solution

Dunton Enviromental used one of Siltbusters containerised chemical dosing system to improve the settlement characteristics of the suspended solids. This was used in conjunction with two Siltbuster HB50 lamella clarifiers to capture and store the solids before the water was discharged to a nearby brook.

A containerised chemical dosing system was used in this application to ensure the security of the chemicals and dosing pumps, whilst enabling the system to be installed at the far end of the site in small footprint.

Back to top
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation
Our first 1 day practical pollution awareness course will be at Cadbury World, Birmingham on the 27th March. Book y… https://t.co/xhiwfisNEd
1:30 PM 8 Feb 2019 Join the conversation