Hotel Construction

Client:ECS Groundworks Ltd
Flow Rate:50m³/hr

Background

In readiness for the construction of a new hotel complex at Heathrow Airport, ECS are conducting ground preparation works and service diversions at a highly constrained and complex site.

The Overall Objective

As part of trenching works being carried out through contaminated ground. All water needed to be collected in a series of networks and treated prior to discharge in order to meet Heathrow Airport’s strict water drainage quality criteria.

Solution

Siltbuster visited the site and planned the works to establish the correct treatment requirements to deal with the flow rates and enable contaminant removal.

Siltbuster installed an HB50 unit to ensure the water could be successfully treated and subsequently discharged from site. Throughout the project Siltbuster provided regular support to ensure any problems could be solved quickly.

Treated water was regularly sampled by Heathrow’s laboratory service and every sample successfully passed its quality criteria.

Back to top
We're at the #EWWM conference today and tomorrow. Drop by for a chat about DAF, MBBR and Lamella water treatment so… https://t.co/WRc15K09lJ
9:58 AM 17 Jul 2018 Join the conversation
A few places remaining on the Siltbuster 2-day Environmental Professionals CPD course in Reading 18/19 July. Book n… https://t.co/OqWZhuWCfb
9:26 AM 3 Jul 2018 Join the conversation
Another batch of HB50Es are ready and on their way to our partner Telstar in France to further support the surface… https://t.co/HBXJcNat1o
2:16 PM 28 Jun 2018 Join the conversation
Download your free copy of Siltbuster's white paper explaining the EA's Regulatory Position Statement – “Temporary… https://t.co/rKmmA0d1NS
10:41 AM 22 Jun 2018 Join the conversation
We’ve got new positions (Senior Process Design Engineer and Technical Sales Engineer – Municipal) on our website… https://t.co/gs1qEKjqZX
9:22 AM 15 Jun 2018 Join the conversation